Find Us

Zhengzhou, China

Opeining Time

7 * 24 hours for you

  1. Home
  2. >> Bf 70 Crusher Specification

Bf 70 Crusher Specification

8.Trial run with loading for ten hours, if the stuff is hard, no above problems and the temperature of bearing doesn’t exceed 70℃, the machine can be put into operation. Ⅵ. Instructions 1. Preparation before Start-up. 1)Check the lubrication. (the manufacturer just oil the machine for trial run).

Send Email:[email protected]

Related News